The Metropolitan
The Metropolitan
State College, PA
High-rise, student and young professional, luxury apartments.
Excavation ranged from 45 feet deep at the parking garage floor to 53.5 feet deep at the foundation for one of the two sets of elevators. The 43,000 cubic yard excavation was required to be systematically installed and ran seven days a week with two crews working four day shifts with four 328 excavators. Installation of a new site storm sewer system, all utility services, a water main extension, reconstruction of the alley running adjacent to the site, and concrete hardscape was also completed.